How mechanical contractors maximize efficiency with Revizto. Jun 11, 2020 Follow
In this Hard Hat Huddle we are discussing how mechanical contractors can maximize their efficiencies with BIM/VDC and best leverage Revizto as their Integrated Collaboration Platform (ICP). Greg Keller (Revizto) is joined by Frakie Davis Jr from WmT Spaeder to share their BIM/VDC expertise hitting a range of topics.
- Leveraging point clouds to compare existing conditions and the 3D model.
- Improving communication between VDC, the Fab Shop, and the Field
- Getting Owner buy-in through VR
Guest Speaker: Frankie Davis Jr, BIM/VDC Sr Project Coordinator at WmT Spaeder
Agenda:
- Intro - 5 Minutes
- Contractor Pain Points - 7 Minutes (Frankie Davis Jr, WmT Spaeder)
- Panel Discussion - 7 Minutes
- Q&A - 10 Minutes
The video is based on an older Revizto version. Your user experience may slightly differ from the video due to recent Revizto updates.
Comments
0 comments
Please sign in to leave a comment.