Migrating Project from a Revizto 5.0 Beta Build to 5.1 Follow
During the Revizto 5 beta period we introduced the change of format in which data is stored in the Revizto project. Therefore, after switching to the latest 5.1 beta version you cannot continue working with the project created in the earlier 5.0 beta version.
Here is the video tutorial on what and how you can transfer from 5.0 to 5.1 build.
Comments
0 comments
Please sign in to leave a comment.